Optimisation in brief:
- Plan for inspection and maintenance.
- Development of emergency plans.
- Risk analysis based on FMEA (Failure Mode and Effect Analysis).
- Improved flow control parameters in the PLC to increase throughput.
- Trial operations under test and production conditions.
- Integration test in connection with other system components.
- Simulating potential improvements.
- On-site training for system operators.