Material Flow Analysis for Production Facilities

Flow Mapping of the Current Situation

Capacity and Bottleneck Analysis

Layout Optimization and Freed Floor Space

Simulation Before You Decide

Common Questions About Material Flow Analysis

It depends on the size of the facility, the scope of the analysis, and the availability of your production data. The work may include a site visit and review of layout, volumes, and production conditions. The scope is determined together with you in an initial stage.

Typically, a layout drawing, production volumes, cycle times, and information about current transport routes are needed. If parts of the documentation are missing, we will help you identify what information needs to be supplemented.

Yes. With the OCS VSE service, the proposed system can be simulated based on relevant production data. This makes it possible to evaluate the solution and compare different alternatives before a decision is made. Price is based on the project’s complexity.

In many cases, the mapping can be carried out during ongoing operations through observations and analysis of existing production data. The conditions are assessed in close dialogue with you as a customer.

The scope and price are set during the preliminary study, as it depends on the size of the facility. Please contact us via the contact page to review the conditions.

Ready to optimize your production?

Smiling OCS employee at the production line